Sign In | Join Free | My disqueenfrance.com
China Hengshui Aoxing Geological Equipment Co., Ltd logo
Hengshui Aoxing Geological Equipment Co., Ltd
Honesty as the foundation, win-win for the world, the virtue of the company, and the virtue of carrying things.
Verified Supplier

1 Years

Home > Core Drill Equipment >

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

Hengshui Aoxing Geological Equipment Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

Brand Name : Aoxing

Model Number : XY-150 type

Certification : ISO9001

Place of Origin : Hebei,China

MOQ : 1 Set

Supply Ability : 30 Sets/Month

Packaging Details : in Plywood Case

Model NO. : XY-150Type

Condition : New

Motor : Diesel Engine

Drill Hole Diameter : 46-300mm

Drill Hole Depth : 150m

Bit Type : Diamond Bit

Drilling Way : Rotary

Usage : Geotechnical, Soil Test, Water Well

Diesel Engine : Changchai Zs1105

Contact Now

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

XY-150 is a portable and multipurpose engineering exploration drilling rig, applicable to the engineering geological exploration in fields of industrial and civil buildings, railways, bridges, hydropower engineering, as well as small-diameter foundation pile hole drilling.

1. Large torque, multiple drilling speeds in an appropriate range.


2. With 2-wheels trailer, the rig can be moved by towing the trailer.
3. Capable to drill inclined holes at different angle.
4. High efficiency drilling with hydraulic feeding structure.
5. Multiple usages, geotechnical investigation for engineering constructions, SPT soil test, mineral exploration, small size pile hole, water well boring.

The technical parameter of the XY-150T Drilling Rig:

Basic Parameters
Drilling depth 45-180m
Drilling diameter 300-76mm
Drill pipe diameter 42mm 50mm AW BW AWJ BWJ
Gross weight of drilling machine(engine not included) 500kg
Dimension (length ×width × height) 2050 × 1180× 1420 mm
Revolving Plate
Rated speed 60 200 400 610 1100 r/min
Maximum torque 1800N*m
Driving travel 450mm
Maximum Cylinder driving force 20KN
Maximum Cylinder lifting force 30KN
Lifter
Lifting capacity 24KN
Bobbin line speed (2 layers) 0.20 0.72 1.26 2.8 m/s
Bobbin diameter 125mm
Rope diameter 11mm
Rope capacity 26m
Oil pumps:
Displacement: 20ml/r
Normal speed 2500r/min
Normal pressure 20MPa
Max pressure 25MPa
Drive motor
Type Changchai ZS1105 diesel engine
Rated power 13.2KW
Rated speed 2200r/min
weight 163kg
Frame
Type Sliding type(with base frame)
Movable travel of drill 400m
Distance between drill and hole-opening 280mm

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig

Safety hazards of drilling rigs
1. When conducting standard penetration tests, the operator must keep their hands away from the probe when the centrifugal hammer falls freely to prevent the probe from falling off and injuring the operator.
2. When the drilling rig is in operation, on-site personnel must wear safety helmets and personnel unrelated to the operation must not approach the drilling rig to prevent the top fasteners of the drilling rig tower from falling and injuring them.
3. During the operation of the drilling rig, always pay attention to the mud pump behind the rig. If the mud pipe ruptures or the drill pipe is blocked during high-pressure operation, it may cause mud spraying and injure on-site personnel.
4. Before starting work, it is necessary to check whether there are any safety hazards in the steel wire rope on the winch and the fasteners of the elevator, in order to prevent the steel wire from breaking and the fasteners from falling off when lifting the probe rod, which may harm the on-site operators.


Product Tags:

diamond bit core drilling rig

      

diesel engine core drilling rig

      

diamond bit crawler drilling rig

      
China 150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig wholesale

150mSpt Soil Testing/Geotechnical Investigation Core Drilling Rig Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hengshui Aoxing Geological Equipment Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0